NAC Mechanical & Electrical Services

  • Pay Online
  • 24-Hour Service
  • Careers
  • Capabilities
    • Construction Services
      • Electrical
      • Piping
      • Plumbing
      • Sheet Metal
      • Boiler & Burner
    • Building Technology
      • Automation
      • Security
      • Thermal Imaging For Touchless Fever Screening Cameras
    • Services/Maintenance
      • Electrical
      • Plumbing
      • Heating & Cooling – HVAC
      • Indoor Air Quality
      • Building Technology
      • Specialty
      • 24 Hour & Emergency
    • Construction Support Services
      • Engineering & Design
      • Estimation
    • Fabrication
    • Parts & Equipment Distribution
      • Equipment Rental
  • Project Experience
  • About Us
    • About NAC
    • History
    • Management Team
    • Safety
    • News
  • Contact Us
  • Project Experience >>
  • All Projects
  • Commercial
  • Education
  • Industrial
  • Specialty

UMN Medical Device Relocation Project

Project Scope: mechanical, plumbing

Location: Minneapolis, MN

The University of Minnesota’s state-of-the-art medical devices laboratory is an 8,000-square-foot facility built specifically for designing, prototyping and testing new medical devices. Facilities include a flagship/brainstorming conference room; a wet laboratory; a mechanical fabrication room; advanced prototyping/testing room; CAD lab; 3-D imaging room; simulation portal/3D Touch table room; offices; and meeting rooms.

Installed supply, general exhaust and hood exhaust phoenix air valves to control lab rooms
pressure in multiple areas. NAC also Installed a complete air distribution systems connecting to existing supply, return and exhaust while serving other occupied areas. The lab exhaust was a completely welded stainless steel system.

This project was a full mechanical and plumbing install for a space that was converted from a parking ramp to a medical device lab. This created some challenges from the sloped structure and minimal ceiling space available, requiring careful coordination with 3D drawings in order to fit all of the services that necessary within the space. Additional challenges included the compressed schedule and the requirement to install stainless steel welded exhaust for the fume hoods. NAC completed this job on time through the coordinated drawing efforts between the field and the office that allowed NAC to identify conflicts early on in the project, minimizing redesign delays.

Filed Under: All Projects

Like What You See?
Contact Us Today!

Get In Touch

Connect With Us

  • News
  • 24-Hour Service
  • Employee Login
APi Group Inc

Privacy Policy | Terms and Conditions

Copyright © 2024 NAC Mechanical & Electrical All rights reserved.
NAC Mechanical & Electrical is a subsidiary of APi Group
APi Group is a trademark of APi Group, Inc.
It is registered in the United States and in many other countries.