Community School of Excellence

Scope:  plumbing, gas piping, controls, and sheet metal

Location: St Paul, MN

Project Size: three stories 130,000-foot

 

The construction of a new three-story 130,000-foot charter school was a design and build project that utilized all of NAC’s disciplines.

NAC performed a complete installation of plumbing, gas piping, controls, and sheet metal in the new building. The project required NAC’s coordi­nation with multiple trades, General Contractor, as well as the Owner’s group to ensure near seamless installation as the building was being erected.

Filed Under: All Projects, Education