At this building technology project, NAC installed a temperature control system (BAS), automation control sequence and a full automation system. NAC assured that all units run seamlessly in order to sustain the quality of the Hospital. 100% renovation to Plumbing, HVAC for the hospitals main central sterilization & surgical sterilization area. (During the 9 month project the sterilization area’s needed to be in
operation for hospital use.)

  • Replaced/updated multiple panels in the building
  • Worked while the building was in use
  • Adjust programming so it fits with other technology like iPad
  • Integrated existing systems to work with Alerton

 